The public source summarizes a 20-unit pre-shipment sample. Customer, order, product-model, inspector and supplier identifiers were removed before publication.
- Inspection month
- August 2026
- Sampling reference
- GB/T 2828.1-2003, General Level I, as recorded
- Source wording
- No exception documented; no separately signed final acceptance
The buyer question
Does the inspected configuration operate under defined conditions, show recorded electrical-safety measurements, and match the expected component and packaging package closely enough to proceed to an order decision?
What the record documents
- Functional readings: recirculation at 3.20 A, 382 W and 2.0 L/min; spray-gun open at 5.36 A, 621 W, 1.1 L/min and 148 bar; spray-gun stopped pressure at 192 bar.
- Electrical-safety readings: dielectric leakage 0.634 mA at 1,500 V; protective-grounding resistance 46 mΩ at 25 A; insulation resistance 852.4 MΩ at 500 V.
- Component record: source entries for power cord, fuse, switch, capacitor and motor resistance, plus photos of selected assemblies and accessories.
- Packaging: recorded unit package 37 × 29 × 43.5 cm, net 8.6 kg and gross 9.9 kg.
Decision boundary
The source documents observations and measurements, but it does not contain a separately signed final acceptance statement. Component markings were transcribed; the public summary does not validate ownership, scope or current certification status. A buyer should still confirm the exact order model, approved sample, current documents and agreed acceptance criteria.
What a stronger order brief adds
Specify coating application, flow and pressure expectation, hose/gun/tip package, market voltage, plug, labels, packaging, sample approval, inspection sample plan and release authority. This converts a useful historical record into a clear future-order control plan.
This is a representative procurement-control explanation, not a customer testimonial, certification or guarantee for another model, lot or order.